Stockingfield Junction Bridge was a project that reconnects 3 communities in north of Glasgow and completes the last linkage in the Forth & Clyde Canal towpath. The bridge itself is a curved design with a viewing platform.
We were tasked with the design and build of the control system for the project.
The site has 105 DALI Bollards, 20 DALI Handrails LED Drivers, 37 DMX RGBW LED lights. The main control is provided by an Pharos LPC1 and 6 RIOD’s.
The 4G router that was built into the system allows Scottish Canals to set the lighting up for events from any computer or mobile device via the webpages. This also allows us to monitor the system and also get notification of faults if they happen.